Mongolia Tour ranch

1. Meet the 10 yurts at the same time

2. Total Power Station: 1.5KWp

3. Types of loader: Energy-saving lamps\ TV\ Radio\ Chargers\ Razor and so on

4. It can be demolished at any time

5. Ensure security of people and livestock

1. Concentrated power-generate, splitting control

2. Stent is the type of activities,which is convenient for the migration.

1. Enectricity in car parking is from solar energy.

2. Light-controlled or manual control.

3. Types of loader: LED\ Energy-saving lamps\ Fire Alarm System.

4. Total Power Station: 6KWp

1. Improve the electricity distribution lines.

2. Use the independently developed solar power controllerof our company.

3. The system鈥檚 stability requirements is high.